
Our Work
Our state of the art facilities are newly built, incorporating both modern and traditional design elements. With careful attention to construction, our facilities are grounded on strong foundations that can support multiple levels and withstand harsh weather conditions. We aim to provide great facilities to foster the best learning environment possible. We are currently in the process of constructing a high school, computer lab, library, and recreation center.

01
AMI Ministry Center
The Ministry Center was founded in 2017 and has been expanding ever since. It includes Iglesia La Gracia, the AMI Colegio, and a Medical Clinic.
02
AMI Colegio
Founded in 2019 and opened in 2020, the AMI Colegio will be the main Elementary and Middle School building.





03
Cafeteria
Features a loft, and a full commercial kitchen to provide healthy and nutritious meals to our staff and students.
IN PROGRESS
04
Playground
Features an enclosed playground and multipurpose court, which dually serves as a basketball court and soccer court.



04
Computer Lab
In construction and will be completed in November 2021. Access to the computer lab will provide an immersive education coupled with technology.

06
High School
Atop the hill next to the Colegio, we are constructing a high school for our current and future students.


05
Library
The Library is expected to be set up by December 2021, and will allow for students to check out a wide range of both Spanish and English literature.

07
Recreation Center
Atop the empty hill to the left of the School, constructing a recreation center, including a pool, volleyball courts, basketball courts, and tennis courts.